Goods sorting in logistics

Goods sorting in logistics according to plan

The line is designed to sort goods from the input to individual output gates according to a pre-prepared picking plan.

  • View of the sorting conveyor
  • Main page of control system

  • The line distributes goods from the input to the corresponding output gates.
  • Which goods should be sent to which gate is determined by the picking list imported from the company’s logistics software.
  • The line has its own FTP server, which creates an i nternal plan after receiving the picking list.
  • An operator scans the product’s EAN barcode using a wireless barcode scanner, or can alternatively enter the code via a touchscreen display.
  • After scanning the EAN code, the required route for the dispatched goods opens.
  • Once dispatched, the goods are removed from the internal plan.

Cookies!
Na zabezpečenie správneho fungovania našej webovej stránky používame len nevyhnutné technické cookies. Viac informácii